Improving Vici Park

Our committee, office staff and head coaches have been working hard over the last 16 months to ensure the club is sitting in an improved financial position whilst ensuring the building receives some much needed upgrades.

We are proud of all that has been achieved and are excited to continue to work together and improve Vici Park for all our members.

Some of our recent achievements:

Building and Infrastructure

  • Roof and southern wall painted in heat reflective paint – 100% sponsored by Higgins Coatings
  • Remainder of walls painted in heat reflective paint – heavily discounted
  • Replaced alsynite sheeting (clear roof sheets) – Insurance claim
  • Replaced old heat extracting fans with new solar heat extracting fans
  • Added motors to 4 out of 7 roller doors
  • Installed security light to car park area and repaired existing external lighting
  • Repaired Fire Exit lights

Council has agreed to assist us with the maintenance of the grounds around the gym and will look at making improvements to the car park area.

New Gym Equipment

  • New gym floor – $100k+
  • New Bars
  • New MAG rings
  • Addition of strength area and strength equipment upstairs
  • Included installation of fencing to gym floor area

Rearrangement of the gym floor to accommodate new floor and other equipment and to use the space more efficiently

Uniforms

  • New competition leotard for all comp WAG/MAG/TRP gymnasts
  • WAG Level 1-3 and TRP Level 1-2 leotard still in progress
  • New Staff Shirt
  • 2021 Membership shirt with sponsors

Sponsorship

  • Successful in gaining 11 sponsors (over 4 levels) for the 2021 year
  • Installation of sponsor signs on internal and external walls
  • Membership shirt

Major Sponsor – Vector Health

Gold Sponsors

Clark Rubber, Design + Architecture and OxConnect

Silver Sponsors

Bolsover Dental, Grant & Simpson, ZED Electrical, MCM Plumbing & New Horizons

Bronze Sponsors

Amanda McConachy Cosmetic Tattoo and Beauty & McGrath

New Office Equipment

  • Laptops for staff
  • iPad for events
  • TV’s for gym floor
  • New colour printer

Events Hosted

  • Gym Sleepover – October 2020
  • Christmas Club Carnival – Nov 2020
  • WAG/MAG Dolphin’s Invitational – Jun 2021
  • TRP/WAG/MAG Dolphin’s Club Carnival – Jun 2021
  • The Rose Trampoline Challenge – Jun 2021

Competition Success

WAG Queensland State Club Championships – Jul 2021

  • Level 4 Team – 9th Overall & 9th Uneven Bars in Queensland
  • Level 5 Team – 7th Vault, 9th Floor & 6th Uneven Bars
  • Level 6 Team – 8th Overall, 5th Uneven Bars

CQ Club Champion Award – Aug 2021

  • WAG Level 3 – 1st Overall
  • WAG Level 4 – 1st Overall
  • WAG Level 5 – 1st Overall
  • WAG Level 6 – 1st Overall
  • 1st Overall Club in Central Queensland

Active Members

2019 – Total 666

  • TRP – 171
  • WAG – 291
  • MAG – 44
  • GFA – 140

2020 – Total 569

  • TRP – 89
  • WAG – 287
  • MAG – 42
  • GFA – 138

2021  – Total (YTD) 745

  • TRP – 98
  • WAG – 362
  • MAG – 55
  • GFA – 216

Successful Grant Applications

  • $35K Community Benefit Gambling Fund / Barry O’Rourke (assisted in the purchase of the floor)
  •  $500 Council discretionary fund – assisted with external lighting
  • $5000 for website
  • $3000 for office equipment

Fundraising

  • Multi-draw raffle
  • A number of weekend sausage sizzles – VPGTC
  • Bunnings Sausage Sizzle – April 2021
  • Canteen at Dolphins Invitational, Club Carnivals and The Rose
  • Pie Drive – July 2021
  • Ice Cup sales

What’s next?

  • Move MAG high bar and install
  • Adjust trampoline location
  • Mat trampoline walls
  •  Storage container – empty canteen contents
  • Replace uneven bar rails
  • New beam matting (floor)
  • Free standing loops bar
  • New foam for pit
  • Upgrade trampoline
  • Replace tumble tramp springs
  • Replace old boxes and beat boards
  • Reconnect sound system
  • Replace lights with LED
  • Coaches video analysis
  • Finish the remaining three electric roller doors
  • Squat rack for strength area
  • Create garden bed to the left of the front door
  • Work with council to resurface the carpark
  • Create staff office in canteen
  • Insulate the building
  • Building extension

We’d like to thank all of our 2021 sponsors and volunteers who have contributed to our success this year. We appreciate the time and resources you can provide us and are excited to continue working together to make Vici Park a safe and exciting place for your children to grow up in!

Kind Regards,
Victoria Park Team

Follow us

instagram